Skip to main content

Aon Pilot Assessment: Modules and Practice

Aon, formerly cut-e, sells a set of short pilot modules that airlines mix into an online screening stage. Jet2’s cadet scheme names nine of them, each taking about 5 to 10 minutes.

Practise scales ndb

scales ndb (Sense of Orientation), scales cmo (Monitoring Ability), Applied Numeracy and gapChallenge (Deductive Reasoning) are in the Aon / cut-e unlock: £15 for all 14 tests, one-time payment, no subscription. Or try scales ix (Inductive Reasoning) free first.

Modules
Nine at Jet2, from hand-eye co-ordination to applied numeracy.
Time
About 5 to 10 minutes each, plus instructions and practice items.
Pilot knowledge
Not needed.
Deadline
Within 4 days of the invitation at Jet2.
Re-check
Jet2 validates some results again under supervision later on.
Pass mark
None published. Aon says its performance tests usually deduct points for wrong answers.

What the Aon pilot assessment is

There is no single Aon pilot test. Aon offers short modules, each measuring one thing, and the airline picks the set. Jet2’s 2026 guide calls its set the Aon Pilot Assessments and says they need no pilot knowledge or experience. Ryanair’s cadet page in 2023 also named an online pre-assessment test provided by Aon, before a selection day in Dublin.

Most modules are built by an item generator as you go, so no two candidates see the same questions.

The nine modules Jet2 lists

Jet2 names the abilities, not the test codes. Here is what each one most likely is:

  • Sense of direction: most likely scales ndb. A gyrocompass and a radio compass tell you where a beacon is; you work out the aircraft’s position and course relative to it. 3 minutes.
  • Monitoring ability: most likely scales cmo. Count how many objects moved in a field of identical ones. 2 minutes.
  • Applied numeracy: 20 four-option questions in four timed sections of five: unit conversion, rule of three, percentages, and areas and volumes. 3 minutes per section, calculator and paper allowed.
  • Logical reasoning: most likely scales lst, a grid where each symbol appears once per row and column and you find the one for the empty cell. 6 minutes.
  • Hand-eye co-ordination: a live steering task.
  • Multitasking ability and reaction speed: live, timed tasks that mix responses.
  • Working memory: Jet2 does not say which test.
  • English language proficiency: a language test.

Worked examples

Sense of direction: the heading indicator reads 090 and the radio compass needle points 45 degrees right of the nose. The beacon is on a bearing of 090 + 45 = 135 from the aircraft, to its south-east. So the aircraft is north-west of the beacon, flying east.

Applied numeracy: 6 pumps move 900 litres a minute, so how much do 10 move? One pump moves 150, so 10 move 1,500 litres. A price of 240 plus 15 percent is 240 × 1.15 = 276. A hold 4 m by 2.5 m by 1.8 m holds 18 cubic metres.

Where it sits at Jet2

Jet2FlightPath runs four online stages: the application, the Arctic Shores task-based games, the Aon Pilot Assessments, then a one-way HireVue video interview. You get about 4 days to finish each stage. Jet2 says some of the online results are validated again under supervision later in the process, so a score you cannot repeat in person is of no use to you.

Tips for the real thing

The modules are short, so small slips cost a lot:

  • Use a desktop or laptop with a mouse in a quiet room, and close everything else.
  • Read the instructions and do the practice items properly. They do not count, and they show you the controls.
  • Have a calculator and paper ready for applied numeracy, and check units before you calculate.
  • For sense of direction, fix the beacon’s bearing first, then turn it round to find where you are.
  • Aon says its performance tests usually take points off for wrong answers, so do not guess wildly on the timed modules.

Our Aon pilot practice

scales ndb gives you 3 minutes to answer as many as you can, each with two dials and four map options. scales cmo gives you 2 minutes of dot fields: count the dots that moved and type the number. Applied Numeracy has 20 questions in four sections of five, 3 minutes each, with a calculator allowed. For logical reasoning, gapChallenge is Aon’s game version of the same grid task. Hand-eye co-ordination, multitasking, reaction speed and English need live equipment or a language test, so we do not offer them.

Questions candidates ask

What is in the Aon pilot assessment?

Short modules chosen by the airline. Jet2 lists hand-eye co-ordination, sense of direction, multitasking, monitoring, logical reasoning, working memory, English, reaction speed and applied numeracy.

How long is the Jet2 Aon assessment?

Each module takes about 5 to 10 minutes plus instructions and practice. Jet2 gives you about 4 days to complete the stage.

Do I need pilot knowledge for the Aon pilot tests?

No. Jet2 says the modules do not need any specific pilot knowledge or experience.

Can I use a calculator on Aon applied numeracy?

Yes. Aon allows a calculator, pen and paper for applied numeracy.

Does Ryanair use Aon?

Its cadet page named an online pre-assessment test provided by Aon in 2023. The current page names no vendor, so check your invitation.

Is the Aon pilot assessment checked again?

At Jet2, yes. Some completed online assessments are validated under supervised conditions later in the process.

Read next

Try it before the real thing

Get used to the Pilot assessment format with our practice version before you take the real one. It is part of the Aon / cut-e unlock.

Practise scales ndb